Signed in as:
filler@godaddy.com
Signed in as:
filler@godaddy.com
This phase begins with meeting with prospective clients in order to ensure we have enough details to create the best version of the required project. We discuss things like budget, material, measurements, amongst other options to ensure the lowest costs with quality work. We also discuss things like, start date and completion date.We create a FREE estimate using all details discuss during our initial visit. Once the client has chosen us for their project we send out a contract with a step by step detail of the project. Once all questions and concerns are addressed we sign contract and begin work on start date. We do require a 30% deposit to ensure material and any required tools or machinery.
We have material delivered 1-2 days prior to commencement of project. During construction we will keep communication open with client to ensure we deliver the up most quality work to the clients satisfaction.
The last step in any build. This phase includes site cleanup, systems training, final inspections and move-in coordination. After completion, we have a final walkthrough with client to ensure you're complete satisfaction.
WE DO MOST INDOOR RENOVATIONS AND REPAIRS
WE DO ALL TYPE OF TILING. INCLUDING BACKSPLASH, FLOORING, BATHROOM, AND WALLS.
WE DO ALL PAHSES OF WALL. FROM FRAMING, DRYWALL HANGING, AND PAINTING.
RENOVATION OF KITHEN AND BATHS. INSTALLING CABINETS, VANITIES, BATHS TUBS, FIXTURES, AND MORE.
WE DO ALL OUTDOOR PROJECTS.
OUTDOOR PATIOS, STEPS, AND WALKWAYS USING BLUESTONE,PAVERS, AND CONCRETE.
WE INSTALL WOOD, VINYL, ALUMINUM, AND CHAIN LINK FENCE.
FRENCH DRAIN, CHANNEL, AND TRENCH DRAIN.
WE DO ALL OUTDOOR PROJECTS.
OUTDOOR PATIOS USING CONCRETE OR STAMP CONCRETE.
VENEER SIDING, THIN BRICK AND MUCH MORE.
FRENCH DRAIN, CHANNEL, AND TRENCH DRAIN.
Add a footnote if this applies to your business